All fixings are included in the wall/floor bracket packages, offering you a hassle-free installation.

Wall and floor fixings
Mounting brackets allow easy installation of condensate drains and small oil/water separators to walls, on the floor or inside of refrigerated dryers.
Particularly high pressure compressors generate lots of vibrations. In applications like these it is wise to fix drains adjacent to the compressor.
The JORC mounting brackets offer the suitable solution for these special applications.
The bracket kits contains all necessary fixings to complete the job.
Wall mounted configuration.
Floor mounted configuration.
- To simplify installation, various drains and small oil/water separators can be supplied with a mounting bracket for fixing against walls or floors.
- All fixing requirements are included.
Related Products

FLUIDRAIN TIMER
The FLUIDRAIN Timer is produced using SMT (Surface Mounting Technology), ensuring improved performance and consistency process.

EZ-1 TIMER
The EZ-1 Timer is produced using SMT (Surface Mounting Technology), ensuring improved performance and consistency process.

FLUIDRAIN-COMBO-QUICKSET
The FLUIDRAIN-COMBO-QUICKSET feature is a predetermined time setting applied on timer controlled condensate drains designed to automatically remove condensate from compressed air systems.

FLUIDRAIN-HP-S
High pressure timer controlled condensate drains are designed to automatically remove condensate from compressed air systems up to 500 bar.

EZ-1
The EZ-1 Timer Controlled Condensate Drain is a combination of a solenoid valve and an electronic timer designed to automatically remove condensate from compressed air systems.
